Engagements

Three ways in.

Three ways to use forty-five years of shuttle and AGV safety. Scope is agreed before anything starts, and every engagement ends with something you can put in the file.

An automated palletising cell behind fixed safety guarding.

Scope and price

Pick the one that matches your exposure.

Fees are agreed per engagement, in writing, before anything starts. Where a machine turns out to be more than it looked, you hear it before the invoice, not after.

Safety concept review

For a system on the drawing board, or one whose safety concept has never been read by an outsider.

Per system

Typically two to four weeks

  • Risk assessment reviewed to EN ISO 12100
  • Safety functions and required performance level challenged
  • Layout and safety envelope checked to EN ISO 3691‑4
  • Written findings, ranked by exposure

Recommended

Standards representation

For a manufacturer whose systems are shaped by standards it has no seat at the table for. Most of this industry is in that position.

Retained

Per committee cycle

  • Your position carried into the ISO and CEN standards process
  • Draft standards read and their impact explained
  • Early warning on changes before they are published
  • Attendance and reporting on national mirror committees

Advisory support

For an engineering team that needs a second opinion, or wants the experience transferred before it is gone.

By the day

As needed, no minimum

  • Second opinion on a contested safety decision
  • Technical file and declaration reviewed clause by clause
  • Design reviews with your engineering team
  • Knowledge transfer to your younger engineers

Side by side

What each one leaves you holding.

What you getConcept reviewStandards representationAdvisory support
Written findings, ranked by exposureYesYes
Risk assessment reviewed to EN ISO 12100YesYes
Safety envelope checked to EN ISO 3691-4YesYes
Technical file and declaration reviewedYes
Seat taken in ISO and CEN working groupsYes
Early warning on draft standardsYes
Knowledge transfer to your engineersYes

How an engagement runs

Four steps, in this order.

Each step produces something written. Nothing moves to the next one until the last is settled on your side.

Step 01

The drawing

You send the layout and the machine list. You get scope and a fixed fee back inside three working days.

Step 02

The read

I read what already exists — risk assessment, safety functions, field sets, layout — and the questions come back to you in writing.

Step 03

The findings

Written findings, ranked by exposure, each one hung on the clause it actually comes from rather than on an opinion.

Step 04

The follow-through

I stay reachable while your team closes the findings out, and I read the file once more before anyone signs the declaration.

A machine without a file is not on the market. It is exposed.

Send the layout drawing and I will tell you what the machine is, which standards apply, and where the risk actually sits.